User Tools

Site Tools


advanced:visualization_gallery

Visualization Gallery

This page showcases a variety of examples for visualizing data using Digital-Clay components.

Note that any of these components may also be combined together in Dashboards and Document Templates, and fully customized visualizations may also be built using HTML code and web components within Document Templates, HTML Tabs and custom web pages.






Multiple pivoted graphs with colors and shapes to visually separate each pivot section:








'Spark Charts' with rule-based highlighting based on values in each chart:








Multiple values displayed per row in separate graphs:








More rule-based graph formatting that change not only individual points, but also various graph properties:








Mixing of several graph types with custom transparency, 3D and color settings:








'Bullet Graph' style with 3 colored values and 3 background zones:








Multiple 'Bullet Graphs' with zones and marks:








A 'Gantt' graph using two different sized Boxes, date indicators, and two color zones/marks:








Multiple color-coded gauges with fancier background settings:








Showing the same data in two different graphs side-by-side for visual comparison:








Ditto, with two different kinds of graphs:








Dimensions (user/workgroup) on both the x and y axes with a hidden indicator determining the size:








Plotting two indicators against each other with a large amount of color-coded series in order to find correlations and patterns:








Line charts combined with bubbles and color-coding, one using a heatmap:









Miscellaneous Surface graphs:









Contour charts:








Interline graph with grid-lines:








Line graph with an 'interlined' Mark and a gradient plot-area:








Color-coded area graph with a color zone and a trend-line:








Graph with the bars made transparent and only the labels showing:








Trend-lines with confidence band and a mark:








Mixed bar shapes:








Mixed bar sizes with trend lines, indented labels, and an opposite x-axis:








Line chart showing average values with min/max whisker values:








Showcase for various pie and donut features:








Showcasing a variety of gauge features in a graph matrix:








Pivoted analysis table with color-coding, and size according to values:








Analysis table with heat-mapping, and customized fonts per pivot and totals:








Analysis table used as a grid to plot existing mappings between two dimensions:








Gantt component:








Some hierarchical charts using the Chart component:


advanced/visualization_gallery.txt ยท Last modified: by 127.0.0.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki